The objective
Lay out a commercial site in King Township, with the new building already up and the site work going in around it.
Setup
The SP30 base sat on a hydrant mount. The rover staked from the CAD loaded on the Spherefix data collector, so every point came straight off the drawings.
- SP30Base, on the hydrant mount
- SP30Rover
- CAD on the controllerStakeout source
What it produced
The layout done efficiently, straight from the drawings.




