Apartment site layout, Pelham


Construction layout in Pelham: a tight site beside new four-storey buildings, trees and power lines, where the Spherefix SP30 held a fixed solution.

PelhamLocation
SP30 base and roverEquipment
Fixed on every shotResultField report. The stakeout screen shows 7 mm H / 12 mm V estimated, on 30+ satellites.
Spherefix SP30 rover on a site beside a new four-storey apartment building, Pelham

The objective

Lay out a tight site in Pelham, hemmed in by new four-storey buildings, mature trees and overhead lines. That is the kind of sky view that costs a GNSS rover its fix.

Setup

An SP30 base on a tripod and an SP30 rover, staking from the CAD on the Spherefix data collector. The drone flew the site as well.

  • SP30
    Base, on a tripod
  • SP30
    Rover
  • CAD on the controller
    Stakeout source
  • Drone
    Flown over the site as well

What it produced

A fixed solution on every shot, right up against the buildings. The stakeout screen shows 7 mm horizontal and 12 mm vertical estimated precision, tracking more than 30 satellites.

Tell us the machine and the job

We will tell you what it needs and what it costs, without a sales call first.

Get a quote